T 8/30
- Introductions
- Open Lab tour
- Triptych Assignment
- Introducing the collaborative project
Th 9/1
- CDE Audition, Amanda comes to Sculpture Class
T 9/6
- Readings due. All classes meet to go over project together
Th 9/8
- Tour of Hanaway, Safety concerns
T 9/13
Th 9/15
T 9/20
Th 9/22
T 9/27
Th 9/29
T 10/4
Th 10/6
- First run-through of Ideas for collab project
T 10/11
Th 10/13
T 10/18
Th 10/20
- 5 Objects Worksheet Due
T 10/25
- Due Sculpture Paper 2
- 3D Object exported from 123DCatch to Meshmixer
Th 10/27
- Main ideas solidified enough for a rough preliminary performance for collab project run-through. Theater Tech sketched out. (Location TBD)
- Object altered and in 123DMake to be made planar.
T 11/1
Dxf of Model ready for Printing (Here is how)
Th 11/3
T 11/8
Th 11/10
M 11/14
- Objects, props, costumes, etc. finished for collab project
T 11/15
- 100 Form Drawings Due
- History of the World Paper Due
Th 11/17
T 11/22
- Main theater available for rehearsal for collab project
T 11/29
Th 12/1
F 12/2
- CDE Performance on the main stage in Hanaway
T 12/6
Th 12/8
T 12/13
- Final Exam: 11:00-1:30